Posted: Wed Jun 11, 2008 6:20 pm Post subject: New Section of Cottages |
|
|
We have several new residents in the cottages. With that said, the planning has begun for a new section of cottages to be constructed. We are currently working on grading/ land development schedules, interior selections, construction scheduling, etc.
If you are interested in making some selections on your new cottage do not hesitate to contact us to discuss the details.
Below are some photos of the Cottages currently built.
.gif) |
|
| Back to top |
|
 |
scottk
Joined: 25 Sep 2002 Posts: 141
|
Posted: Wed Jun 11, 2008 6:22 pm Post subject: |
|
|
 |
|
| Back to top |
|
 |
scottk
Joined: 25 Sep 2002 Posts: 141
|
Posted: Wed Oct 01, 2008 11:55 am Post subject: |
|
|
The next section of four cottages located on fairway #15 has begun construction. With three new families joining the cottages of crow creek and one of the new tanglewoods being built under contract and selections made, there is still time to choose your location and selections. As much interest as we are receiving on the cottages right now, please make sure to speak with your property specialist.
Here are the first photos of the footings and block being installed.
 |
|
| Back to top |
|
 |
admin Site Admin
Joined: 22 Jun 2002 Posts: 34
|
Posted: Fri Dec 05, 2008 2:39 pm Post subject: |
|
|
Here are a few photos showing the latest construction progress. Right now the exterior brickwork, interior hardwood flooring and plumbing rough-in are all underway.
 |
|
| Back to top |
|
 |
admin Site Admin
Joined: 22 Jun 2002 Posts: 34
|
Posted: Tue Dec 16, 2008 6:35 pm Post subject: |
|
|
Here are some of the latest exterior photos of both sets of cottages. The brick and hardi-plank installation has begun.
 |
|
| Back to top |
|
 |
admin Site Admin
Joined: 22 Jun 2002 Posts: 34
|
Posted: Wed Dec 31, 2008 6:50 pm Post subject: |
|
|
Here are some of the latest exterior photos showing the new azalea and tanglewood front elevations.
 |
|
| Back to top |
|
 |
admin Site Admin
Joined: 22 Jun 2002 Posts: 34
|
Posted: Wed Dec 31, 2008 6:54 pm Post subject: |
|
|
The sheetrock has been completed, cabinets and ceramic tile installed.
 |
|
| Back to top |
|
 |
scottk
Joined: 25 Sep 2002 Posts: 141
|
Posted: Fri Mar 06, 2009 3:29 pm Post subject: |
|
|
Since the last photos posted the exteriors have been painted and garage doors hung. The forms have been installed for the aggregate concrete driveway to be poured, which is scheduled for next week.

Last edited by scottk on Fri Mar 06, 2009 3:32 pm, edited 1 time in total |
|
| Back to top |
|
 |
scottk
Joined: 25 Sep 2002 Posts: 141
|
Posted: Fri Mar 06, 2009 3:31 pm Post subject: |
|
|
On the interior the plumbing, door & bathroom hardware has been installed. In addition, the closet shelving is completed as well. Based on the progress we are looking at an early to mid April timeframe for completion.
 |
|
| Back to top |
|
 |
scottk
Joined: 25 Sep 2002 Posts: 141
|
Posted: Mon Mar 09, 2009 6:01 pm Post subject: |
|
|
The concrete work has begun and here are a few photos showing the start of the aggregate driveway and cul-de-sac.
 |
|
| Back to top |
|
 |
scottk
Joined: 25 Sep 2002 Posts: 141
|
Posted: Sun Mar 29, 2009 5:17 pm Post subject: |
|
|
These photos show the progress inside the cottages which are expected to be completed in April.
 |
|